construction and services

Case Study: Backfilling to Piling Beams Ready for Substructure Blockwork

Project Overview Canno Construction was appointed to complete the backfilling works around newly installed piling beams, preparing the site for

Case Study: Precision Drainage Installation – NHBC Perfect Score

We were contracted to deliver high-precision internal plot drainage for a new residential development. The project called for meticulous planning

concrete driveway

Case Study: Garden Redesign & Patio Installation – Whitley

This garden transformation in Whitley involved a complete overhaul of an awkward and uneven outdoor space. The brief was to

Case Study: Double Garage Concrete Slab with Reinforced Steel and C35 Fibre Mix

Our team was commissioned to complete a high-strength concrete pour for a new double garage base, designed to withstand heavy

Case Study: 300m Gabion Basket Retaining Wall Installation

We were contracted to deliver a substantial retaining solution using gabion baskets for a large-scale development project. The brief was